CCNP Troubleshooting

CISCO CCNP - SWITCH (300-115)

Implement VLAN based solution, given a network design and a set of requirements

  • Determine network resources needed for implementing a VLAN based solution on a network 
  • Create a VLAN based implementation plan 
  • Create a VLAN based verification plan 
  • Configure switch-to-switch connectivity for the VLAN based solution Configure loop prevention for the VLAN based solution 
  • Configure Access Ports for the VLAN based solution. Verify the VLAN based solution was implemented properly using show and debug commands Document results of VLAN implementation and verification
Implement a Security Extension of a Layer 2 solution, given a network design and a set of requirements
  • Determine network resources needed for implementing a Security solution 
  • Create a implementation plan for the Security solution 
  • Create a verification plan for the Security solution 
  • Configure port security features 
  • Configure general switch security features 
  • Configure private VLANs Configure VACL and PACL Verify the Security based solution was implemented properly using show and debug commands Document results of Security implementation and verification
Implement Switch based Layer 3 services, given a network design and a set of requirements
  • Determine network resources needed for implementing a Switch based Layer 3 solution 
  • Create an implementation plan for the Switch based Layer 3 solution 
  • Create a verification plan for the Switch based Layer 3 solution Configure routing interfaces Configure Layer 3 Security 
  • Verify the Switch based Layer 3 solution was implemented properly using show and debug commands 
  • Document results of Switch based Layer 3 implementation and verification
Prepare infrastructure to support Advancedd services
  • Implement a Wireless Extension of a Layer 2 solution 
  • Implement a VoIP support solution 
  • Implement video support solution
Implement High Availability, given a network design and a set of requirements
  • Determine network resources needed for implementing High Availability on a network 
  • Create a High Availability implementation plan 
  • Create a High Availability verification plan 
  • Implement first hop redundancy protocols 
  • Implement switch supervisor redundancy Verify High Availability solution was implemented properly using show and debug commands Document results of High Availability implementation and verification
Best CCNA & CCNP Training Center in Pune. Xmetric Solutions Provide 100% Hands on Products