CCNP Troubleshooting

CISCO CCNP-ROUTE (300-101)

Implement an EIGRP based solution, given a network design and a set of requirements
  • Determine network resources needed for implementing EIGRP on a network
  • Create an EIGRP implementation plan 
  • Create an EIGRP verification plan 
  • Configure EIGRP routing 
  • Verify EIGRP solution was implemented properly using show and debug commands 
  • Document results of EIGRP implementation and verification
Implement a multi-area OSPF Network, given a network design and a set of requirements
  • Determine network resources needed for implementing OSPF on a network 
  • Create an OSPF implementation plan 
  • Create an OSPF verification plan 
  • Configure OSPF routing 
  • Verify OSPF solution was implemented properly using show and debug commands 
  • Document results of OSPF implementation and verification plan
Implement an eBGP based solution, given a network design and a set of requirements
  • Determine network resources needed for implementing eBGP on a network 
  • Create an eBGP implementation plan 
  • Create an eBGP verification plan 
  • Configure eBGP routing 
  • Verify eBGP solution was implemented properly using show and debug commands 
  • Document results of eBGP implementation and verification plan
Implement an IPv6 based solution, given a network design and a set of requirements
  • Determine network resources needed for implementing IPv6 on a network 
  • Create an IPv6 implementation plan
  • Create an IPv6 verification plan Configure IPv6 routing 
  • Configure IPv6 interoperation with IPv4 Verify IPv6 solution was implemented properly using show and debug commands 
  • Document results of IPv6 implementation and verification plan
Implement an IPv4 or IPv6 based redistribution solution, given a network design and a set of requirements
  • Create a redistribution implementation plan based upon the results of the redistribution analysis 
  • Create a redistribution verification plan 
  • Configure a redistribution solution 
  • Verify that a redistribution was implemented 
  • Document results of a redistribution implementation and verification plan 
  • Identify the differences between implementing an IPv4 and IPv6 redistribution solution
Implement Layer 3 Path Control Solution
  • Create a Layer 3 path control implementation plan based upon the results of the redistribution analysis 
  • Create a Layer 3 path control verification plan 
  • Configure Layer 3 path control 
  • Verify that a Layer 3 path control was implemented 
  • Document results of a Layer 3 path control implementation and verificationplan 
  • Implement basic teleworker and branch services 
  • Describe broadband technologies 
  • Configure basic broadband connections 
  • Describe basic VPN technologies 
  • Configure GRE 

 

Best CCNA & CCNP Training Center in Pune. Xmetric Solutions Provide 100% Hands on Products